Coverage of the section of Calle 30 in the Mahou-Calderón area

Coverage of the section of Calle 30 in the Mahou-Calderón area

Description

The works consisted of burying the M-30 highway, in a section of more than 600 m in length and 40 m in width as it passes through the old Vicente Calderón stadium, and in expanding the area of ​​Madrid Río, to an urban park that will run along the bed of the Manzanares River

Project Data

  • Client: JV FERROVIAL S.A. and ACCIONA S.A.
  • Owner: Ayuntamiento de Madrid
  • Completion date: 2023
  • Products provided: T beams, placas armadas de ancho variable y prelosas pretensadas
  • Precast Volume: 8.375 m3

Scope of Works

Design, manufacturing, transportation and assembly of 11.439 precast slabs, place on 481 T beams with a total volume of concrete of 8,375 m3.

Galería de Fotos

Soluciones Aplicadas

  • Español (ES)
  • English (UK)