No need for transverse joints between beams.
Separation between element axes measuring 4.5 m.
Use of a single support at each end of the beam.
Option of creating prestressed or post-tensioned pieces.
Cantilever support on 4 temporary or permanent points.
Decks with variable depth slabs using permanent or temporary struts or a variable edge truss.